ELETTROSTAR
Headquarter
The client's requirements were to have new offices for the company, with the need to have a direct contact between the production workers and the offices workers.

The office building is part of an existing industrial unit in the south-west.
Has been built on the site of the former office space but with a greater extension.
The new building is on two floors.
On the ground floor there is an entrance lobby area with waiting area and secretariat area with an adjoining hallway and a toilet with dressing.
From the hall you enter directly into the production of the hall which gives access to the area changing rooms and toilets for employees.
From the entrance hall through a steel staircase is possible to reach the first floor.
Here thera are three offices space connected to each other by a corridor overlooking the production area by a glass partition, so you can ensure a continuous relationship between production area and office area. An office has a closet. All rooms are equipped with air conditioning.
existing situation
ground floor plan
first floor plan
demolition phase
foundations
cutting of the staircase wall
staircase wall construction
steel wall
building phase
end of building construction
window detail
window
window detail
the offices
the staircase
the staircase
detail

place:Calto, Rovigo, IT

category:job assignmnet

client:Elettrostar S.r.l.

architect:Rudy Davi, Stefano Bizzarri

structure engineer:Silvia Smanio

heating engineer:Lineo Trentin

contractor:Garbo Costruzioni S.r.l.

frames:Alifor S.r.l.

hydraulic system:Berzuini S.n.c.

wiring system:Elettrostar

surface:100 sqm

date of commission:2010

date of construction:2010 - 2011

cost:76.000 euro

status:built

photography:Fabio Angiuli